{"created":"2023-05-15T12:20:44.984334+00:00","id":11424,"links":{},"metadata":{"_buckets":{"deposit":"2fb6f352-abad-41f5-90bd-320617d63dfe"},"_deposit":{"created_by":1,"id":"11424","owners":[1],"pid":{"revision_id":0,"type":"depid","value":"11424"},"status":"published"},"_oai":{"id":"oai:kansai-u.repo.nii.ac.jp:00011424","sets":["528:1588:1592:1594"]},"author_link":["26167","26163","26166","26168","26164","26165"],"item_9_alternative_title_20":{"attribute_name":"その他のタイトル","attribute_value_mlt":[{"subitem_alternative_title":"A Simulation-Based Production Scheduling Method Aiming to Optimize Due-Date Related Criteria : Schedule Generation Method and Due-Date-Deviation Minimization"}]},"item_9_biblio_info_7":{"attribute_name":"書誌情報","attribute_value_mlt":[{"bibliographicIssueDates":{"bibliographicIssueDate":"2001-06-15","bibliographicIssueDateType":"Issued"},"bibliographicIssueNumber":"2","bibliographicPageEnd":"91","bibliographicPageStart":"80","bibliographicVolumeNumber":"52","bibliographic_titles":[{"bibliographic_title":"日本経営工学会論文誌"}]}]},"item_9_description_4":{"attribute_name":"概要","attribute_value_mlt":[{"subitem_description":"生産スケジュールにおけるジョブの納期遅れと納期前ずれの和を\"納期はずれ\"評価指標値と呼び, その最小化を目的とするシミュレーションベースのスケジューリング法を提案する.シミュレーション法を用いて, 納期はずれを最小とするスケジュールを作成するためには, (a)納期遅れだけでなく納期前ずれも少なくできるようなジョブ割付けの制御機能と, (b)納期遅れと納期前ずれの程度を調整する機能が必要となる.本論文では, まず(a)の機能を備えたスケジュール生成法として, バックワード/フォワード・ハイブリッドシミュレーション法タイプD(BFHS/typeD)を提案する.つぎに, (b)の機能は, パラメータ空間上で最良スケジュールを探索する方式により実現する.BFHS/typeD法の第1ステップで実行するバックワードシミュレーションの特性 を検討し, それに基づいて, 納期はずれが最小となるスケジュールを求めるためのパラメータ空間とスケジューリングの手順を提案する.提案したスケジューリング法の評価に関しては, 単純ジョブショップ過程モデルを用いるだけでなく, さらに現実に稼動中のスケジューリングシステムから得られた計画条件データを用いてその有効性を明らかにする.\n\\nA simulation-based scheduling method for minimizing the due-date-deviation is proposed on the basis of a combination of the BFHS(Backward/Forward Hybrid Simulation)method and the parameter-space-search-improvement method. In order to minimize the due-date-deviation in a simulation-based scheduling, two functions are indispensable : the first function is to control operation-onset timing of jobs at all work centers to avoid inadequate early completion of jobs, and at the same time to determine job priorities so as to suppress the late completion of the job, and the second is to adjust the balance of the two reductions properly so that the final schedule achieves the minimization of the due-date-deviation. In this paper, a new schedule generation method named the BFHS/type D is first proposed, in which the information generated during the backward simulation is utilized to control operation-onset timings and job priorities in the forward simulation. Then, after the investigation of the backward simulation characteristics, two parameters are introduced in relation to due-date-deviation to manipulate directly the backward simulation process and consequently to manipulate indirectly the forward simulation process in the BFHS/type D method. Finally, a scheduling procedure is proposed to search out the best schedule with respect to the due-date-deviation on the space spanned by the two parameters. The effectiveness and efficiency of the proposed method is demonstrated by using a set of planning conditions obtained not only from a simple job-shop model, but also from a practical large-scale system.","subitem_description_type":"Other"}]},"item_9_full_name_3":{"attribute_name":"著者別名","attribute_value_mlt":[{"nameIdentifiers":[{"nameIdentifier":"26166","nameIdentifierScheme":"WEKO"}],"names":[{"name":"Arakawa, Masahiro"}]},{"nameIdentifiers":[{"nameIdentifier":"26167","nameIdentifierScheme":"WEKO"}],"names":[{"name":"Fuyuki, Masahiko"}]},{"nameIdentifiers":[{"nameIdentifier":"26168","nameIdentifierScheme":"WEKO"}],"names":[{"name":"Inoue, Ichiro"}]}]},"item_9_publisher_34":{"attribute_name":"出版者","attribute_value_mlt":[{"subitem_publisher":"日本経営工学会"}]},"item_9_rights_13":{"attribute_name":"権利","attribute_value_mlt":[{"subitem_rights":"Copyright: 日本経営工学会"}]},"item_9_source_id_10":{"attribute_name":"書誌レコードID","attribute_value_mlt":[{"subitem_source_identifier":"AN10561806","subitem_source_identifier_type":"NCID"}]},"item_9_source_id_8":{"attribute_name":"ISSN","attribute_value_mlt":[{"subitem_source_identifier":"13422618","subitem_source_identifier_type":"ISSN"}]},"item_9_version_type_17":{"attribute_name":"著者版フラグ","attribute_value_mlt":[{"subitem_version_resource":"http://purl.org/coar/version/c_970fb48d4fbd8a85","subitem_version_type":"VoR"}]},"item_creator":{"attribute_name":"著者","attribute_type":"creator","attribute_value_mlt":[{"creatorNames":[{"creatorName":"荒川, 雅裕"}],"nameIdentifiers":[{}]},{"creatorNames":[{"creatorName":"冬木, 正彦"}],"nameIdentifiers":[{}]},{"creatorNames":[{"creatorName":"井上, 一郎"}],"nameIdentifiers":[{}]}]},"item_files":{"attribute_name":"ファイル情報","attribute_type":"file","attribute_value_mlt":[{"accessrole":"open_date","date":[{"dateType":"Available","dateValue":"2019-05-23"}],"displaytype":"detail","filename":"KU-1100-20010615-02.pdf","filesize":[{"value":"1.2 MB"}],"format":"application/pdf","licensetype":"license_note","mimetype":"application/pdf","url":{"label":"KU-1100-20010615-02.pdf","url":"https://kansai-u.repo.nii.ac.jp/record/11424/files/KU-1100-20010615-02.pdf"},"version_id":"c91819a8-d04a-4c2b-a252-36bf002b87e2"}]},"item_keyword":{"attribute_name":"キーワード","attribute_value_mlt":[{"subitem_subject":"simulation","subitem_subject_scheme":"Other"},{"subitem_subject":"scheduling","subitem_subject_scheme":"Other"},{"subitem_subject":"obshop","subitem_subject_scheme":"Other"},{"subitem_subject":"due-date-deviation minimization","subitem_subject_scheme":"Other"},{"subitem_subject":"シミュレーション","subitem_subject_scheme":"Other"},{"subitem_subject":"スケジューリング","subitem_subject_scheme":"Other"},{"subitem_subject":"ジョブショップ","subitem_subject_scheme":"Other"},{"subitem_subject":"納期はずれ最小化","subitem_subject_scheme":"Other"}]},"item_language":{"attribute_name":"言語","attribute_value_mlt":[{"subitem_language":"jpn"}]},"item_resource_type":{"attribute_name":"資源タイプ","attribute_value_mlt":[{"resourcetype":"journal article","resourceuri":"http://purl.org/coar/resource_type/c_6501"}]},"item_title":"納期関連評価指標値の最適化を指向するシミュレーションベース生産スケジューリング : スケジュール生成法と納期はずれ最小化スケジューリング法","item_titles":{"attribute_name":"タイトル","attribute_value_mlt":[{"subitem_title":"納期関連評価指標値の最適化を指向するシミュレーションベース生産スケジューリング : スケジュール生成法と納期はずれ最小化スケジューリング法"}]},"item_type_id":"9","owner":"1","path":["1594"],"pubdate":{"attribute_name":"公開日","attribute_value":"2012-06-29"},"publish_date":"2012-06-29","publish_status":"0","recid":"11424","relation_version_is_last":true,"title":["納期関連評価指標値の最適化を指向するシミュレーションベース生産スケジューリング : スケジュール生成法と納期はずれ最小化スケジューリング法"],"weko_creator_id":"1","weko_shared_id":-1},"updated":"2023-05-15T19:15:55.751625+00:00"}